Construction Projects

dynamic message sign icon

Baggs-Encampment

Project Number: DR12295A

WYDOT Contact: Jake Lonn, phone: cell 307-321-1671, email: null

Contractor: High Country Construction, Inc., Lander, WY, 307-332-4933

Scheduled Completion Date: 2013-Nov-31

Damage repair including grading, draining, placing crushed base and bituminous pavement surfacing stockpiling crushed base and miscellaneous work on .089 mile of WYO 70 beginning at MP 30 northeast of Baggs

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY7030.0 to 32.0None

Last Updated: 2013-06-17 13:42:21.890

dynamic message sign icon

Bridge Black Sort River on County Road 221

Project Number: Brof0c19034

WYDOT Contact: Waylon Lym, phone: 307 789 3363, email: waylon.lynn@wyo.gov

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2013-Oct-31

The bridge over Black Sort River is out due to construction, therefore County Road 221 is closed. Reference marker .80

Last Updated: 2013-06-17 14:32:25.802

dynamic message sign icon

Bridge Rehabilitation

Project Number: IM-SR0.00B133013

WYDOT Contact: Leslie Ranta, phone: 352-3036/C 389-8437, email: leslie.ranta@wyo.gov

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2013-Oct-31

Bridge Rehabilitation on I-80 between RM 85 to RM 91 both directions.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I8085.0 to 91.0Paved
Reduced speeds up to 30 MPH

Last Updated: 2013-06-17 14:34:24.025

dynamic message sign icon

Bridge Rehabilitation - US 26 MP 142.8

Project Number: B133022

WYDOT Contact: Leslie Ranta, phone: 352-3036/C 389-8437, email: leslie.ranta@wyo.gov

Contractor: Cannon Builders, Inc., Blackfoot, ID, 208-785-6281

Scheduled Completion Date: 2013-Jun-30

Bridge rehabilitation work. Traffic will be controlled by a temporary traffic signal system with traffic alternating across bridge in each direction. Speeds will be reduced and minimum delays should be expected.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US26142.8 to 142.8PavedNone

Last Updated: 2013-06-17 14:34:40.448

dynamic message sign icon

Bridge Rehabilitation over Laramie River I-80-Marginal

Project Number: IM-SR-I805170

WYDOT Contact: Steven Cook, phone: 307-745-2115, email: steve.cook@wyo.gov

Contractor: S & S Builders, LLC, Gillette, WY, 307-686-5659

Scheduled Completion Date: 2013-Jun-30

Structure repair including an overlay on the eastbound structure. Both eastbound and westbound structures will be worked on simultaneously with lane closures in each direction for the duration of the project. Single lane traffic reduced to 45 mph.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80312.4 to 312.4PavedNone

Last Updated: 2013-06-17 13:33:31.588

dynamic message sign icon

Bridge Rehabilitation- Various Locations

Project Number: B131009

WYDOT Contact: Wayne Shenefelt, phone: 630-8462, email: null

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2013-Oct-01

Bridge rehabilitation and miscellaneous work at various locations in transportation district 1.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80359.99 to 367.42PavedNone

Last Updated: 2013-06-17 13:53:33.369

dynamic message sign icon

Bridge Repair between Yellowstone Park and Cody

Project Number: NH 0.28 DR50901, NH-SR 2.26 N311096

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: todd.frost@wyo.gov

Contractor: Dietzler Construction Corporation, Torrington, WY, 307-333-7552

Scheduled Completion Date: 2013-Jul-31

Bridge repair and miscellaneous work at RM 0.28 and RM 2.26 on US 14/16/20 between Yellowstone Park and Cody. One way traffic over the structure with a temporary traffic signal. Delays less than 5 minutes. 14¿ width restriction.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US140.28 to 2.26Paved
10 minute delays
US160.28 to 2.26Paved
10 minute delays
US200.28 to 2.26Paved
10 minute delays

Last Updated: 2013-06-17 13:47:36.121

dynamic message sign icon

Buffalo-Gillette Powder River West Section

Project Number: IM-0902113

WYDOT Contact: Isaac Finkle, phone: 307.684.2505, email: null

Contractor: Riverside Contracting, Inc., Missoula, MT, 406-721-9267

Scheduled Completion Date: 2014-Jun-30

Resurfacing and isolated reconstruction involving grading, draining, placing bituminous pavement leveling and surfacing, structure, fencing and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I9083.37 to 89.19PavedNone

Last Updated: 2013-06-17 14:13:33.649

dynamic message sign icon

Casper South

Project Number: N212086

WYDOT Contact: Jack Stone, phone: 307-473-3227, email: jack.stone@wyo.gov

Contractor: McMurry Ready-Mix Co., Casper, WY, 307-473-9581

Scheduled Completion Date: 2013-Oct-31

Grading, draining, milling plant mix, placing crushed and blended base, bituminous pavement surfacing, plant mix wearing course, guardrail and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY220102.96 to 108.42Paved
Reduced speeds up to 30 MPH

Last Updated: 2013-06-17 14:28:03.417

dynamic message sign icon

Douglas west

Project Number: NH-I253109

WYDOT Contact: James Barnes, phone: 359-1113, email: james.barnes@wyo.gov

Contractor: McMurry Ready-Mix Co., Casper, WY, 307-473-9581

Scheduled Completion Date: 2013-Nov-30

Reconstruction and resurfacing for 4.1 miles from milepost 145 to 149. Two lanes of travel.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I25145.0 to 149.0PavedNone

Last Updated: 2013-06-17 14:24:19.237

dynamic message sign icon

Fort Bridger-Carter Road (Bridge over Blacks Fork River)

Project Number: BROS-OC19034

WYDOT Contact: Karleen Taylor, phone: 789-3363, email: null

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2013-Oct-31

Bridge replacement including grading, draining, placing crushed base, structural steel and miscellaneous work.

Last Updated: 2013-06-17 15:25:59.551

dynamic message sign icon

Happy Jack Road (Curt Gowdy Section)

Project Number: SCPlSL13-0107025

WYDOT Contact: Tim Morton, phone: 630-8461/777-4404, email: timothy.morton@wyo.gov

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2013-Oct-31

Grading, draining, milling plant mix, placing crushed base, bituminous pavement surfacing and leveling, plant mix wearing course, installation of road closure system and ITS communication system, wetland construction, guardrail, signing, fencing and miscellaneous work on 6.36 miles on WYO 210 beginning at RM 20.45 on Happy Jack Road.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY21020.45 to 26.81PavedNone

Last Updated: 2013-05-09 16:23:38.416

dynamic message sign icon

Hoback Jct.

Project Number: N104006

WYDOT Contact: Bob Hammond, phone: 307-733-3665, email: bob.hammond@wyo.gov

Contractor: Wadsworth Brothers Construction Co., Draper, UT, 801-576-1453

Scheduled Completion Date: 2013-Oct-31

Reconstruction of Hoback Jct with a new bridge, retaining wall, landslide stabilization, roundabout, roadway, pathways, and park and ride.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US89141.0 to 142.0PavedNone
US189141.0 to 142.0PavedNone
US191163.0 to 163.67PavedNone

Last Updated: 2013-06-17 14:20:40.322

dynamic message sign icon

I-25 College Dr (Diverging Diamond Interchange)

Project Number: I251163

WYDOT Contact: Wayne Shenefelt, phone: null, email: null

Contractor: S & S Builders, LLC - Cheyenne, Cheyenne, WY, 307-632-7115

Scheduled Completion Date: 2013-Oct-01

On Monday February 4, 2013 traffic will be restricted to one lane in each direction on WY 212. Grading, draining, placing crushed base, concrete pavement, sidewalk, curb & gutter, bridge deck repair, electrical, signing and miscellaneous work at I-25 College Drive interchange.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I257.85 to 7.85PavedNone

Last Updated: 2013-06-17 13:35:46.234

dynamic message sign icon

I-25 North of Kaycee

Project Number: I255106

WYDOT Contact: Chad Aagard, phone: 307-473-3225, email: chad.aagard@wyo.gov

Contractor: Riverside Contracting, Inc., Missoula, MT, 406-721-9267

Scheduled Completion Date: 2014-Jun-30

Pavement milling and resurfacing for 11.2 miles (per Wyoming Roadwork Guide) Road Maintainer # 307-272-1973

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I25253.0 to 264.0PavedNone

Last Updated: 2013-06-17 14:29:25.467

dynamic message sign icon

I-25 Platte County line north

Project Number: I252162

WYDOT Contact: Tim Rasnake, phone: 307-331-3144, email: tim.rasnake@wyo.gov

Contractor: Knife River, Cheyenne, WY, 307-634-5455

Scheduled Completion Date: 2013-Sep-30

Pavement milling and resurfacing for 13.8 miles from milepost 48-52 south of Chugwater. Width restriction in construction zone.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I2548.0 to 52.0PavedNone

Last Updated: 2013-06-17 14:34:48.823

dynamic message sign icon

Kemmerer Bypass

Project Number: AML-N121109

WYDOT Contact: Jennifer Hoffman, phone: 307-679-4811, email: jennifer.hoffman@wyo.gov

Contractor: HK Contractors, Inc., Idaho Falls, ID, 208-523-6600

Scheduled Completion Date: 2013-Oct-31

Milling and overlay

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US3052.49 to 54.55Paved
10 minute delays with stopped conditions

Last Updated: 2013-06-17 14:22:44.920

dynamic message sign icon

Powell-Big Horn County Line

Project Number: SCP-SL13 N291060

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: todd.frost@wyo.gov

Contractor: Mountain Construction Company, Lovell, WY, 307-548-7186

Scheduled Completion Date: 2013-Oct-31

Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal, signs and miscellaneous work on 4.19 miles on US 14A beginning at RM 25.20 to RM 29.393 between Powell and the Big Horn County Line.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US1425.2 to 29.393Paved
20 minute delays

Last Updated: 2013-06-17 13:46:47.916

dynamic message sign icon

Robertson Road (WYO 410)

Project Number: SL13-2101011

WYDOT Contact: Damon Newsome, phone: 789-3363, email: damon.newsome@wyo.gov

Contractor: LeGrand Johnson Construction Co., Logan, UT, 435-787-6001

Scheduled Completion Date: 2013-Nov-30

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, structure rehabilitation, guardrail, signing, fencing and misc work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY4103.86 to 10.5PavedNone

Last Updated: 2013-06-17 14:39:48.741

dynamic message sign icon

Rock Springs-Rawlins (Tipton section)

Project Number: 0803132&I803144

WYDOT Contact: Leslie Ranta, phone: 352-3036/C 389-8437, email: leslie.ranta@wyo.gov

Contractor: McMurry Ready-Mix Co., Casper, WY, 307-473-9581

Scheduled Completion Date: 2013-Oct-31

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, wearing course, concrete pavement, structure rehab, electrical, guardrail, fencing, and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80153.78 to 162.0Paved
Construction zone speed limit 55 MPH

Last Updated: 2013-06-17 14:34:59.902

dynamic message sign icon

Rock Springs-Rawlins West mp 199-210

Project Number: IM-0804228 & I804243

WYDOT Contact: Ralph Tarango, phone: 307-328-4104, email: ralph.tarango@wyo.gov

Contractor: McMurry Ready-Mix Co., Casper, WY, 307-473-9581

Scheduled Completion Date: 2013-Oct-31

Bridge rehabilitation including grading, draining, placing bituminous pavement leveling and surfacing, structure, signal system and miscellaneous work on 11.93 miles of I-80 beginning at reference marker 199.05 west of Rawlins. Down to two lanes of travel.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I80199.05 to 210.98Paved
Construction zone speed limit 65 MPH

Last Updated: 2013-06-17 13:50:58.175

dynamic message sign icon

Sheridan Marginal

Project Number: IM-1901114

WYDOT Contact: Jerry Buckley, phone: 307-674-2326, email: jerry.buckley@wyo.gov

Contractor: Intermountain Construction & Materials, Gillette, WY, 307-682-8407

Scheduled Completion Date: 2014-Oct-31

grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, plant mix wearing course, concrete pavement, bridge rehabilitations, guardrail, signing, fencing and miscellaneous work on 7.78 miles on I-90 beginning at MP 20.51 just north of Sheridan.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I9020.92 to 25.16PavedNone

Last Updated: 2013-06-17 14:13:18.227

dynamic message sign icon

Shoshoni-Thermop MP 116.4 to 127.3

Project Number: N342039

WYDOT Contact: Robert Scheidemantel, phone: 856-1341; 851-3605, email: null

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2013-Oct-01

Guardrail slope stabilization

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US20116.4 to 127.3Paved
15 minute delays

Last Updated: 2013-06-17 13:50:32.377

dynamic message sign icon

Ten Sleep East MP 0 to MP 5.92

Project Number: SCP-SL-13 0.00 W436001

WYDOT Contact: Dan McAfee, phone: 307-431-2281, email: dan.mcafee@wyo.gov

Contractor: Mountain Construction Company, Lovell, WY, 307-548-7186

Scheduled Completion Date: 2013-Oct-01

Level and Overlay HWY 436 mp 0 to mp 5.92

RoadMilepost(s)SurfaceDelays and Scheduled Closures
null0.0 to 5.92PavedNone

Last Updated: 2013-06-17 13:53:04.274

dynamic message sign icon

Ten Sleep- Buffalo

Project Number: N361055

WYDOT Contact: Dan McAfee, phone: 307-431-2281, email: dan.mcafee@wyo.gov

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2013-Jun-30

Grading, bituminous pavement surfacing, chip seal, wetland construction, MSE retaining wall, removal and replacement of box culverts, guardrail, and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US1644.0 to 47.0Gravel
Reduced speeds up to 30 MPH

Last Updated: 2013-06-17 14:15:09.200

dynamic message sign icon

Thermoplastic Pavement Markings in District 3

Project Number: HSIP-B133039

WYDOT Contact: Clint Lockman, phone: 307-352-3039, email: clint.lockman@wyo.gov

Contractor: Interstate Barricades, Layton, UT, 801-546-0220

Scheduled Completion Date: 2013-Sep-31

Installation of thermoplastic pavement markings and miscellaneous work at various locations.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
I805.0 to 28.0PavedNone
US300.0 to 52.49PavedNone
US3054.55 to 89.0PavedNone
US18934.5 to 34.5PavedNone
US1919.0 to 130.0PavedNone
WY1503.2 to 3.2PavedNone
WY41496.0 to 135.0PavedNone

Last Updated: 2013-06-17 14:28:43.481

dynamic message sign icon

Thermopolis-Meeteetse

Project Number: N331021 & N331027

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: todd.frost@wyo.gov

Contractor: McGarvin-Moberly Construction Co., Worland, WY, 307-347-4268

Scheduled Completion Date: 2013-Sep-30

Grading , draining, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal, box culvert extensions, structure, guardrail, signing, fencing and miscellaneous work on 3.28 miles on WYO 120 beginning at RM 0.94 to RM 4.21 between Thermopolis and Meeteetse.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY1200.94 to 4.21Paved
20 minute delays
Construction zone speed limit 45 MPH

Last Updated: 2013-06-17 13:43:56.972

dynamic message sign icon

US 191 South of Rock Springs

Project Number: IM0802191

WYDOT Contact: Clint Lockman, phone: 307-352-3039, email: clint.lockman@wyo.gov

Scheduled Completion Date: 2014-Oct-31

General work on US 191 south of Rock Springs between milepost 499 and 503. There will be flaggers between milepost 499-501 stopping traffic momentarily to allow trucks on and off the road. Possible delay of 15 minutes. On April 1, 2013, I-80 west bound will be restricted to one lane between milepost 99-100. Speed limit will be reduced to 65 MPH.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US191500.0 to 501.0Paved, Grooved
15 minute delays

Last Updated: 2013-06-17 14:28:17.464

dynamic message sign icon

US 26/89 within Jackson city limits

Project Number: unk

Contractor: Evans Construction Company, Jackson, WY, 307-733-3029

Scheduled Completion Date: 2013-Nov-30

Work being done between mp 153.99 and 154.29. Reconstruction between Flat Creek bridge and Jackson St, including building pedestrian pathway.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US89153.99 to 154.29PavedNone

Last Updated: 2013-06-10 11:12:39.031

dynamic message sign icon

US 85 Realignment

Project Number: NH92.60 N253081

WYDOT Contact: Buck Klemola, phone: 307-532-1251, email: buck.klemola@wyo.gov

Contractor: Reiman Corp. and Subsidiary, Cheyenne, WY, 307-632-8971

Scheduled Completion Date: 2014-May-31

Grading, draining, placing crushed base and bituminous pavement surfacing, concrete pavement, structure, sidewalk, curb and gutter, landscaping, water systems, sewer systems, electrical, signing and miscellaneous work.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US2648.61 to 48.76Paved
Reduced speeds up to 20 MPH
US8592.52 to 92.8PavedNone

Last Updated: 2013-06-17 14:33:34.649

dynamic message sign icon

US 89 South of Afton

Project Number: unknown

WYDOT Contact: Mike Garner, phone: 307-886-3886, email: michael.garner@wyo.gov

Contractor: HK Contractors, Inc., Idaho Falls, ID, 208-523-6600

Scheduled Completion Date: 2013-Oct-31

Reconstruction and widening for 3.7 miles between mileposts 82 & 86.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US8982.0 to 86.0PavedNone

Last Updated: 2013-06-17 14:13:32.259

dynamic message sign icon

WYO 220 & WYO 487 ITS District 2

Project Number: STP-0-B122037

WYDOT Contact: Chad Aagard, phone: 307-473-3225, email: chad.aagard@wyo.gov

Contractor: Casper Electric, Inc., Casper, WY, 307-237-3003

Scheduled Completion Date: 2013-Jun-30

Installation of dynamic message signs and a road and weather information system with a camera.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY22096.59 to 97.81PavedNone
WY4870.6 to 0.6PavedNone
WY48737.0 to 37.0PavedNone

Last Updated: 2013-06-17 14:19:32.632

dynamic message sign icon

Worland-Hot Springs Cty line WY431 MP 5-24

Project Number: STP-2200015

WYDOT Contact: Dan McAfee, phone: 307-431-2281, email: dan.mcafee@wyo.gov

Contractor: McGarvin-Moberly Construction Co., Worland, WY, 307-347-4268

Scheduled Completion Date: 2013-Oct-01

Hot plant mix level, overlay, and chip seal WY431 MP 5 to MP 24

RoadMilepost(s)SurfaceDelays and Scheduled Closures
null5.0 to 24.0Paved
15 minute delays

Last Updated: 2013-06-17 13:36:45.549

dynamic message sign icon

Worland/Ten Sleep East

Project Number: N361053

WYDOT Contact: Dan McAfee, phone: 307-431-2281, email: dan.mcafee@wyo.gov

Contractor: Hout Fencing of Wyoming, Inc., Worland, WY, 307-347-9360

Scheduled Completion Date: 2013-May-31

Road work has started back up. Approach paving is taking place.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
US161.52 to 4.87Paved
15 minute delays

Last Updated: 2013-06-17 14:00:48.057

dynamic message sign icon

Wyatte Creek Section-Manville-Lance Creek Rd

Project Number: 1401007

WYDOT Contact: James Barnes, phone: 359-1113, email: james.barnes@wyo.gov

Contractor: High Country Construction, Inc., Lander, WY, 307-332-4933

Scheduled Completion Date: 2013-Dec-01

Total reconstruction of roadway. There are two lanes of travel and there is a pilot car in place. After hours, when pilot car is not running, speeds are 30 MPH.

RoadMilepost(s)SurfaceDelays and Scheduled Closures
WY270104.3 to 107.9Dirt
20 minute delays

Last Updated: 2013-06-17 14:31:49.129