Wyoming State Government: Citizen Business Government Visitor
WYDOT icon five one one icon

Wyoming Travel Information Map

conditions map conditions legend
Hide cities:
Map Size: Small | Medium | Large
Region: All | Northwest | Northeast | Southwest | Southeast | Central

Search for conditions by route or by city on www.wyoroad.info.

Click then scroll down for:

advisory or closure icon Closures and Alerts
web camera icon Web Cameras (without thumbnail images - faster)
web camera icon Web Cameras (with thumbnail images - slower)
weather station icon Weather Stations
construction project icon Construction Projects
dynamic message sign iconvariable speed limit sign icon Dynamic Message and Variable Speed Limit Signs


Construction Projects

construction icon

Alva Slide

Project Number: 0601051

WYDOT Contact: Warren Oyler, phone: (307) 283-1135, email: Warren.Oyler@dot.state.wy.us

Scheduled Completion Date: 2010-Jul-31, Status: Active

Slide repair including, grading, draining, bituminous pavement surfacing and miscellaneous work on .32 miles of WYO 24 beginning at Milepost 24.74 just outside of the Town of Alva

Last Update: 2010-May-25 14:01:21 MDT

construction icon

Buffalo East

Project Number: SCP-SL-N362025

WYDOT Contact: Ron Williams, phone: (307) 684-2505, email: Ron.Williams@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-01, Status: Active

Grading, draining, milling plant mix, placing crushed base and bitumious pavement surfacing, removal and replacement of concrete pavement,

Last Update: 2009-Sep-04 10:55:35 MDT

construction icon

Burma Road

Project Number: 464001

WYDOT Contact: Josh Jundt, phone: (307) 682-3550, email: Josh.Jundt@dot.state.wy.us

Scheduled Completion Date: 2010-Nov-05, Status: Active

Reconstruction and widening of Burma Road from Second to Sixth Street. New I-90 overpass and new road construction from the Interstate south to Lakeway Road.

Last Update: 2010-Aug-09 12:57:47 MDT

construction icon

Casper-Douglas Pavement Distress Repair

Project Number: NH-I253111

WYDOT Contact: Jack Stone, phone: (307) 473-3227, email: Jack.Stone@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Grading milling plant mix, placing recycled crushed base, bituminous pavement surfacing, plant mix wearing course and miscellaneous work at three locations on I-25 between Casper and Douglas.

Last Update: 2010-Jul-28 07:33:48 MDT

construction icon

Center St.

Project Number: RHC-P531017

WYDOT Contact: Clint Lockman, phone: (307) 352-3039, email: Clint.Lockman@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Removal and replacement of existing signal pole and miscellaneous work

Last Update: 2010-Aug-26 09:05:14 MDT

construction icon

Cheyenne West Lincolnway

Project Number: P561028-A01-A02

WYDOT Contact: Don Fuller, phone: (307) 777-4405, email: Don.Fuller@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-15, Status: Active

Expect flaggers in the area....Grading, draining, placng crushed base and bituminous pavement surfacing, electrical and miscellaneous work on 1.59 miles of US 30 (West Lincolnway) beginning at reference marker 359.25 in the City of Cheyenne at RM 359.25

Last Update: 2010-Aug-06 09:43:56 MDT

construction icon

Cliff Creek Curve

Project Number: SSP-TO-N132090B

WYDOT Contact: Bob Maxam, phone: (307) 367-4488, email: Bob.Maxam@dot.state.wy.us

Scheduled Completion Date: 2011-Jun-30, Status: Active

Clearing & grubbing, removal of select trees, placement of crushed base and plant mix pavement overlay.

Last Update: 2010-Aug-23 08:51:19 MDT

construction icon

Cody - Powell, Cody Northeast Section Phase I

Project Number: STIM 10.06 N291036

WYDOT Contact: Todd Frost, phone: (307) 587-2220, email: Todd.Frost@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-15, Status: Active

Grading, draining, placing crushed base and bituminous pavement surfacing, removal dn replacement of bridges and guardrail, fencing, and miscellaneous work on 3.85 miles on US 14A beginning at RM 10.05 between Cody and Powell.

Last Update: 2010-Aug-30 11:36:59 MDT

construction icon

Dell Creek Section

Project Number: NH-P132064

WYDOT Contact: Bob Maxam, phone: (307) 367-4488, email: Bob.Maxam@dot.state.wy.us

Scheduled Completion Date: 2011-Jun-30, Status: Active

Grading, draining, placing crushed base and plant mix pavement, bridge rehabilitation, guardrail, fencing and construction of retaining wall from the Bondurant Fire Hall to the mouth of Hoback Canyon.

Last Update: 2010-Aug-23 08:50:44 MDT

construction icon

District 2 Structure Rehabilitation

Project Number: STIM 0.00 B152009

WYDOT Contact: Tim Rasnake, phone: (307) 322-6500, email: Tim.Rasnake@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-01, Status: Active

Structure Rehabilitation and misc. work at various locations in Transportation District 2

Last Update: 2010-Aug-10 13:28:14 MDT

construction icon

District 3 Guardrail

Project Number: HSIP-SEP-B103013

WYDOT Contact: Jennifer Hoffman, phone: (307) 877-3239, email: Jennifer.Hoffman@dot.state.wy.us

Scheduled Completion Date: 2010-Aug-01, Status: Active

Installing new guardrail and upgrading existing guardrail at various locations.

Last Update: 2010-Jul-13 08:03:36 MDT

construction icon

District 5 Bridge Rehabilitation

Project Number: STP-B095012

WYDOT Contact: Todd Frost, phone: (307) 587-2220, email: Todd.Frost@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Bridge rehabilitation including grading, draining, placing crushed base and bituminous pavement surfacing, structure, bridge deck repair, and miscellaneous work in Big Horn, Fremont, Hot Springs, and Park Counties.

Last Update: 2010-Sep-01 09:34:02 MDT

construction icon

Evanston Streets

Project Number: STIM-E 4.29 6598005 & P511018

WYDOT Contact: Charlie Bauer, phone: (307) 789-3363, email: Charlie.Bauer@dot.state.wy.us

Scheduled Completion Date: 2010-Aug-31, Status: Active

Grading, drainging, placing crushed base and bituminous pavement surfacing, sidewalk, curb and gutter, electrical and miscellaneous work on .32 mile of urban route 051 beginning at reference marker 4.9 in the Town of Evanston.

Last Update: 2010-Apr-01 11:19:11 MDT

construction icon

Glenrock - Ross Road

Project Number: STP-SR-0504019

WYDOT Contact: Jack Stone, phone: (307) 473-3227, email: Jack.Stone@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Bridge rehabilitation and miscellaneous work.

Last Update: 2010-Aug-13 09:39:10 MDT

construction icon

Green River Marginal (Damage Repair)

Project Number: DR31600

WYDOT Contact: Clint Lockman, phone: (307) 352-3039, email: Clint.Lockman@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Damage repair including overhead sign structure, box beam guardrail and miscellaneous work.

Last Update: 2010-Aug-03 11:34:36 MDT

construction icon

Greybull - Lovell (Greybull Northwest Section)

Project Number: NH- N345076

WYDOT Contact: Ben Steed, phone: (307) 568-3439, email: Ben.Steed@dot.state.wy.us

Scheduled Completion Date: 2011-Jun-30, Status: Active

Grading, draining, milling plant mix, pavement surfacing, bridge rehab, cattleguards, guardrail,electrical, and misc. work on 3.93 miles on US 14/16/20 beginning at RM 205.11 between Greybull and Lovell.

Last Update: 2010-Sep-01 09:34:34 MDT

construction icon

Happy Jack Road - Gilchrist Section

Project Number: SCP-SL-0107024

WYDOT Contact: Don Fuller, phone: (307) 777-4405, email: Don.Fuller@dot.state.wy.us

Scheduled Completion Date: 2010-Jul-15, Status: Active

Placing crushed base, bituminous pavement, concrete pavement, remove and replace fence and guardrail at RM 10.38

Last Update: 2010-Jul-14 07:29:36 MDT

construction icon

Hoback Jct

Project Number: N104006

WYDOT Contact: Pete Hallsten, phone: (307) 733-3665, email: Peter.Hallsten@dot.state.wy.us

Scheduled Completion Date: 2012-Oct-31, Status: Active

Reconstruction of Hoback Jct with a new bridge, retaining wall, landslide stabilization, roundabout, roadway, pathways, and park and ride.

Last Update: 2010-Jun-18 08:40:26 MDT

construction icon

Hwy 50

Project Number: 030044 &030045

WYDOT Contact: Josh Jundt, phone: (307) 682-3550, email: Josh.Jundt@dot.state.wy.us

Scheduled Completion Date: 2010-Aug-31, Status: Active

Asphalt pavement overlay

Last Update: 2010-Aug-09 12:57:28 MDT

construction icon

I-80 Evanston - Bigelow

Project Number: I801177

WYDOT Contact: Charlie Bauer, phone: (307) 789-3363, email: Charlie.Bauer@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

milling plant mix, concrete slab replacement, slab lifting and undersealing and miscellaneous work on 28.10 miles on I-80 beginning at RM 0.00 between Evanston and Bigelow Int.

Last Update: 2010-May-27 08:38:35 MDT

construction icon

Lance Creek South

Project Number: STP-1401008

WYDOT Contact: Jim Barnes, phone: (307) 358-5515, email: James.Barnes@dot.state.wy.us

Scheduled Completion Date: 2011-Oct-31, Status: Active

Grading, draining, milling plant mix, placing crushed base and bituminous pavement surfacing, removal and replacement of structures, cattle guards and guardrail, fencing and miscellaneous work on 9.07 miles of WYO 270 between Manville and Lance Creek.

Last Update: 2010-Aug-03 15:38:20 MDT

construction icon

Laramie - Cheyenne

Project Number: STIM-I805165

WYDOT Contact: Scott Taylor, phone: (307) 745-2137, email: Scott.Taylor@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Milling concrete, sealing joints, placing high performance wearing course and miscellaneous work on 5.11 miles on I-80 beginning at RM 318.95 between Laramie and Cheyenne.

Last Update: 2010-Aug-09 10:44:14 MDT

construction icon

Lusk - Mule Creek Junction

Project Number: NH-N854068

WYDOT Contact: Jim Barnes, phone: (307) 358-5515, email: James.Barnes@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Grading, placing bituminous pavement leveling and surfacing and miscellaneous work on 16.80 miles of US 85 beginning at reference marker 168.20 north of Lusk.

Last Update: 2010-Aug-03 15:23:01 MDT

construction icon

Mail Cabin Slide

Project Number: STP-2000051

WYDOT Contact: Pete Hallsten, phone: (307) 733-3665, email: Peter.Hallsten@dot.state.wy.us

Scheduled Completion Date: 2010-Aug-31, Status: Active

Slide repair, plant mix, pavement spot repairs and miscellaneous work

Last Update: 2010-Jun-25 07:38:30 MDT

construction icon

Maint. Chip Seal

Project Number: D3 Maint. Chip Seal

WYDOT Contact: District 3 WYDOT Maintenance, phone: (307) 352-3000, email: Frances.Reed@dot.state.wy.us

Scheduled Completion Date: 2010-Jul-27, Status: Active

Maintenance Chip Seal on WY 412 & US 89

Last Update: 2010-Jul-22 15:13:04 MDT

construction icon

Manderson-Basin

Project Number: N345096

WYDOT Contact: Dan McAfee, phone: (307) 347-2822, email: Dan.McAfee@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Overlay and chip seal

Last Update: 2010-Jul-14 07:01:57 MDT

construction icon

Manderson-Hyattville

Project Number: 0201016

WYDOT Contact: Dan McAfee, phone: (307) 347-2822, email: Dan.McAfee@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Level, overlay, and chip seal.

Last Update: 2010-Jul-14 07:01:42 MDT

construction icon

Moran JCT - Dubois: Togwotee Pass and Fourmile Meadows sections

Project Number: N301016 and 0301018

WYDOT Contact: Lyle Lamb, phone: (307) 455-3590, email: Lyle.Lamb@dot.state.wy.us

Scheduled Completion Date: 2011-Jul-15, Status: Active

Hyperlink: http://www.gotogwoteetrail.com/

>

Reconstruction of US 26/287 from MPs 14.47 to 30.75. Expect 3 HOUR CLOSURES Monday through Friday from 10:00PM to 1:00AM and 1:30AM to 4:30AM and 2 HOUR CLOSURES on Satrudays from 10:00PM to 12:00AM.

Last Update: 2010-Sep-09 08:36:29 MDT

construction icon

ORIN JCT - LUSK

Project Number: STIM N402016

WYDOT Contact: Buck Klemola, phone: (307) 532-1251, email: Buck.Klemola@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-01, Status: Active

Grading, draining, profile milling plant mix, placing pit run subbase and crushed base, bituminous pavement surfacing, chip sealing, removal and replacement of box culverts, cattleguards, guardrail and fencing, electrical systems and miscellaneous work.

Last Update: 2010-Apr-29 10:49:00 MDT

construction icon

Pine Bluffs Marginal Overlay & Slab Replacement

Project Number: IM-I806197

WYDOT Contact: Tom DeHoff, phone: (307) 777-4404, email: Tom.DeHoff@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-30, Status: Active

Milling, grading, placing crushed base, bituminous pavement, leveling surface, slab replacement andmiscellaneous work on I-80 beginning at RM 400.584 and ending at RM 402.78 on the Pine Bluffs Marginal.

Last Update: 2010-Aug-05 10:41:01 MDT

construction icon

Rawlins Marginal

Project Number: NH-0804234

WYDOT Contact: Jake Lonn, phone: (307) 328-4103, email: Jake.Lonn@dot.state.wy.us

Scheduled Completion Date: 2011-Jul-31, Status: Active

Concrete pavement, removal and replacement of structure, removal and replacement of guardrail and miscellaneous work at RM 215.57 over the Cedar Street Interchange (Rawlins Marginal).

Last Update: 2010-Apr-29 08:04:08 MDT

construction icon

Remount Bridge

Project Number: DR11402

WYDOT Contact: Tom DeHoff, phone: (307) 777-4404, email: Tom.DeHoff@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

I-80 East bound lane at MP 339.25 - MP 339.50 will have a 12 foot width restriction starting 7/14/10 for bridge deck repair work - including placing bituminous pavement surfacing, silica fume mod. concrete, fencing and miscellaneous work

Last Update: 2010-Sep-09 08:36:12 MDT

construction icon

Rock Springs-Rawlins (Wamsutter West)

Project Number: 0803135 & 0803A01

WYDOT Contact: Leslie Ranta, phone: (307) 352-3036, email: Leslie.Ranta@dot.state.wy.us

Scheduled Completion Date: 2010-Nov-30, Status: Active

Grading, draining, placing crushed base and bituminous pavement leveling and surfacing, bridge removal and replacement, fencing, electrical conductors, roadway lighting system, remote camera system and miscellaneous work.

Last Update: 2010-Apr-22 08:52:12 MDT

construction icon

Snake River Canyon Repair

Project Number: NH-GM-N103105

WYDOT Contact: Pete Hallsten, phone: (307) 733-3665, email: Peter.Hallsten@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Grading, draining, placing crushed base, and bituminous pavement surfacing, minor structural modification and miscellaneous work beginning at RM 118.32 and ending at RM 141.30 on US 26/89 between Alpine Jct. and Hoback Jct.

Last Update: 2010-Jun-25 06:47:16 MDT

construction icon

Speer Interchange

Project Number: IM-0251153

WYDOT Contact: Don Fuller, phone: (307) 777-4405, email: Don.Fuller@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-15, Status: Active

Expect flaggers in the area....Grading, Draining, Crushed Base, Bituminous Pavement Surfacing, Concrete Surfacing, Bridge Structure, Lighting, Electrical System, Signing, Removal & Replacement fencing at RM 4.75

Last Update: 2010-Aug-06 09:44:20 MDT

construction icon

Steamboat Point Section

Project Number: ACNH-N372021

WYDOT Contact: Jerry Buckley, phone: (307) 674-2326, email: Jerry.Buckley@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-31, Status: Active

Reduced speed limit and expect some delays through the project. Paving has been completed. Seeding, slope work and clean up remains.

Last Update: 2010-Sep-08 07:43:30 MDT

construction icon

Thermopolis-Cody

Project Number: NH-N331026

WYDOT Contact: Dan McAfee, phone: (307) 347-2822, email: Dan.McAfee@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-15, Status: Active

Level, Overlay, and Chip seal.

Last Update: 2010-Jul-13 07:40:42 MDT

construction icon

Tmop-Worland Lucerne Section

Project Number: NH-N343037

WYDOT Contact: Dan McAfee, phone: (307) 347-2822, email: Dan.McAfee@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-15, Status: Active

Milling plant mix, placing crushed base and bituminouse pavement surfacing, plant mix curb, removal and replacement of guardrail and miscellaneous work on 8.75 miles on US 20 beginning at reference marker 111.00 between Thermopolis and Worland

Last Update: 2010-Jul-13 07:42:02 MDT

construction icon

Upton Main Street, US 16

Project Number: N442063

WYDOT Contact: Joni Kachelhoffer, phone: (307) 746-3551, email: Joni.Kachelhoffer@dot.state.wy.us

Scheduled Completion Date: 2010-Oct-29, Status: Active

WIDTH RESTRICTION-12' Grading, placing base and pavement, remove and replace curb and gutter, sidewalk, storm sewer, landscaping, lighting and utility work on 1.67 miles of US 16 within the corporate limits of Upton.

Last Update: 2010-Mar-31 10:25:19 MDT

construction icon

Variable Speed Limit

Project Number: I802193

WYDOT Contact: Clint Lockman, phone: (307) 352-3039, email: Clint.Lockman@dot.state.wy.us

Scheduled Completion Date: 2010-Dec-31, Status: Active

Installation of variable speed limit signs and miscellaneous work

Last Update: 2010-Jul-27 13:52:40 MDT

construction icon

Walcott Jct. - Laramie (Herrick Lane Bridges)

Project Number: IM-I805167

WYDOT Contact: Scott Taylor, phone: (307) 745-2137, email: Scott.Taylor@dot.state.wy.us

Scheduled Completion Date: 2010-Sep-15, Status: Active

Emergency bridge rehabilitation and miscellaneous work on I-80 at RM 297.66 (Herrick Lane Interchange) between Walcott Jct. and Laramie.

Last Update: 2010-Aug-09 10:43:36 MDT

construction icon

Wyoming Blvd. & Poplar St.

Project Number: STP 11.91 W2580019

WYDOT Contact: Chad Aagard, phone: (307) 473-3225, email: Chad.Aagard@dot.state.wy.us

Scheduled Completion Date: 2010-Aug-01, Status: Active

Replacement of concrete pavement, water lines, curb and gutter, sidewalk and miscellaneous work at the intersection of Wyoming Blvd. and Poplar St.

Last Update: 2010-Jun-01 14:38:42 MDT